Logan: A city for families, lifestyle and business
A-Z | Contact Us | Events | Feedback
Search
 
 Quick links


Gold Coast Planning Scheme

Gold Coast Planning Scheme Version 1.1 amended January 2007

Integrated Planning Act 1997 (pdf)

Contents (pdf)

Part 1 Introduction

Division 1 Context (pdf)
Division 2 Towards Ecological Sustainability (pdf)

Context Maps:

CM-1 Gold Coast City Boundaries (pdf)
CM-2 SEQROC Region (pdf)
CM-3 Location of Local Area Plans (pdf)

Part 2 Desired Environmental Outcomes and Performance Indicators

Division 1 Desired Environmental Outcomes (pdf)
Division 2 Performance Indicators (pdf)

Part 3 Planning Strategy

Division 1 Purpose of the Planning Strategy (pdf)
Division 2 Key Strategies (pdf)
Division 3 Land Use Themes (pdf)

Planning Strategy Maps:

PS1 Land Use Themes (pdf)
PS2 River Catchments and Landform (pdf)
PS3 Conservation Strategy Plan (pdf)
PS4 Employment, Investment and Service Centres (Activity Centres) (pdf)
PS5 Infrastructure Provision and Sequencing Strategy (pdf)
PS6 Tourism Strategy (pdf)
PS7 Road System (pdf)
PS8 Public Transport System (pdf)
PS9 Cycling Network (pdf)
PS10 Gold Coast Character Map (pdf)
PS11 City Image Urban form (pdf)
PS12 City Image Major Views (pdf)
PS13 City Image visual Quality (pdf)
PS14 City Image Major Scenic Routes and Transitory Gateways (pdf)
PS15 Pacific Innovation Corridor (pdf)

Part 4 Definitions

Division 1: Dictionary of Terms (pdf)

Part 5 Domains

Division 1: Introduction to Domains (pdf)
Division 2: Domains (pdf)

Domain Maps:

Domain Maps 1:10,000 scale

Domain Maps 1:2,500 scale

Emerging Community Domain Maps:

EC1: Beenleigh District Structure Plan (pdf)

Part 6 Local Area Plans

Division 1 Introduction to Local Area Plans (pdf)
Division 2 Local Area Plans:

Beenleigh Town Centre Local Area Plan (pdf)

LAP Map 1.1 - Boundary (pdf)
LAP Map 1.2 - Frame Area (pdf)
LAP Map 1.3 - Precincts (pdf)
LAP Map 1.4 - Maximum Building Heights (pdf)
LAP Map 1.5 - Maximum Residential Density (pdf)
LAP Map 1.6 - Movement Plan (pdf)
LAP Map 1.7 - Streetscape Character (pdf)

Eagleby Local Area Plan (pdf)

LAP Map 12.1 - Boundary (pdf)
LAP Map 12.2 - Precincts (pdf)
LAP Map 12.3 - Maximum Building Heights (pdf)
LAP Map 12.4 - Maximum Residential Density (pdf)
LAP Map 12.5a - Open Space Network (pdf)
LAP12_5B.pdfLAP Map 12.5b - Open Space Network (pdf)
LAP Map 12.6 - Movement Network (pdf)

Part 7 Codes

Division 1 Introduction to Codes (pdf)
Division 2 Specific Development Codes (pdf)
Division 3 Constraint Codes (pdf)

Part 8 Infrastructure

Part 8 Infrastructure (pdf)

Priority Infrastructure Plan Growth Maps and Tables

Item Statistical Local Area Map Table
IM1-1: Beenleigh, Bethania-Waterford, Eagleby, Edens Landing Map Table
IM1-6: Mt Warren Park, Windaroo-Bannockburn Map Table

Plans for Trunk Infrastructure Maps:

Transport Maps

Item Plans for Trunk Infrastructure
IM2: Transport PFTI - Index
IM2-1: Transport PFTI - Road Systems
IM2-2: Transport PFTI - Beenleigh
IM2-9: Transport PFTI - Hinterland West
IM2-15: Trails PFTI
IM2-16: Trails PFTI
IM2-17: Trails PFTI
IM2-18: Trails PFTI
IM2-19: Trails PFTI
IM2-20: Trails PFTI

Stormwater Maps

Item Plans for Trunk Infrastructure
IM3: Stormwater PFTI - Index
IM3-6: Stormwater PFTI - Bahrs Scrub
IM3-7: Stormwater PFTI - Bannockburn
IM3-8: Stormwater PFTI - Beenleigh
IM3-9: Stormwater PFTI - Belivah
IM3-11: Stormwater PFTI - Bethania
IM3-30: Stormwater PFTI - Eagleby
IM3-31: Stormwater PFTI - Edens Landing
IM3-40: Stormwater PFTI - Holmview
IM3-55: Stormwater PFTI - Mount Warren Park
IM3-85: Stormwater PFTI - Waterford
IM3-87: Stormwater PFTI - Windaroo
IM3-88: Stormwater PFTI - Wolffdene

Recreation Facilities Maps

Item Plans for Trunk Infrastructure
IM4: Recreation Facilities PFTI - Index
IM4-1: Recreation Facilities PFTI - Planning Zones
IM4-2: Recreation Facilities PFTI - Beenleigh, Bethania-Waterford, Eagleby, Edens Landing-Holmview
IM4-4: Recreation Facilities PFTI - Mt Warren Park, Windaroo-Bannockburn

Part 9 List of Planning Scheme Maps

Part 9 List of Planning Scheme Maps (pdf)

Part 10 Schedules

Division 1: Standard Drawings (pdf)
Division 2: Separate Development Legislation (pdf)
Division 3: Special Facilities (pdf)

Special Facilities Maps:

SF3: Driver Training Centre (pdf)
SF5: Bethania (pdf)
SF6: Mt Warren Park (pdf)

Division 4: Designation of Land for Community Infrastructure (pdf)

Part 11 Appendices

Appendix 1: Integrated Planning Act 1997: Schedule 8 (pdf)

Part 12 Planning Scheme Policies (relating to transferring areas)

Overlay Maps

The purpose of Overlay Maps is to demonstrate possible site constraints affecting particular areas or properties. They would normally relate to specific constraint codes or other planning scheme provisions requiring further investigation and resolution of land use issues.

 

 

PH: (07) 3412 3412, Email: council@logan.qld.gov.au
© 2002 Logan City Council - Last updated on Tuesday, May 20, 2008
Privacy & disclaimer notice | Staff access login