'As Constructed' Drawings Submissions
The 'As Constructed' Drawings Submission Checklist (PDF 220 KB) will assist you in providing all the relevant information in your submission.
The following references and examples provide further information and help for preparing your submission.
- Development permits for operational work standard conditions
- Division 6, Part 3, Policy 5 (Design and Construction of Work) (PDF 777 KB) - Logan Planning Scheme 2006
- Sample 'as constructed' standard drawings:
- Sample asset data for sewerage and water reticulation:
- Example Sewer (PDF 74 KB)
- Example Sewer Junctions (PDF 15 KB), Example Sewer Junctions (XLS 18 KB)
- Example Sewer Lines (PDF 11 KB), Example Sewer Lines (XLS 21 KB)
- Example Sewer Points (PDF 11 KB), Example Sewer Points (XLS 20 KB)
- Example Water (PDF 67 KB)
- Example Water Lines (PDF 11 KB), Example Water Lines (XLS 22 KB)
- Example Water Points (PDF 11 KB), Example Water Points (XLS 21 KB)
- Certificates and cover sheets:
- Certification of 'As Constructed' Works Form (PDF 24 KB) (Form 3.6.1A)
- Statement of Compliance (PDF 25 KB) (Form 3.6.1B)
- Digital Cover Sheet and Checklist (PDF 23 KB) (Form 3.6.1C)
'As constructed' information must be submitted to Council for checking and acceptance as soon as the works are completed in accordance with Division 6, Part 3, Policy 5 of the Logan Planning Scheme 2006 and the relevant development permit.

