Heavy lifting delivers new bridge at Munruben

Crane lifts girders into place on bridge at construction site
Bridge girders are lifted into place by crane at Munruben’s Norris Creek.

Published: 27th February 2024

Major upgrade works on Chambers Flat Rd reached another major milestone last week as the new Norris Creek Bridge took shape.

A 500-tonne, all-terrain crane – with a reach of more than 60 metres – was used over three days to lift 90 bridge girders into place.

The creek crossing has been raised by 8 metres to allow for improved access in an area that experiences regular flooding during severe wet weather.

The bridge is part of a 3.8 kilometre upgrade of Chambers Flat Rd, from the Mount Lindesay Hwy to just north of Kings Way. The project is also:

  • widening the road to 3.5 metres each way, with 3 metres sealed shoulders
  • installing turning lanes at the Kings Way and Greenvale Rd intersections
  • improving sight distances at bends and crests.

The project has been designed to improve residential driveway access with new hard surface shoulders.

It will also make journey times shorter for the important connector road.

When the bridge opens towards the end of the year, the one-lane, one-way temporary diversion currently in place will end.

Return to News List