Logan Water service impacts

Work impacts

We will advise you in writing if your property is going to be affected by a water service disruption. A notice will be put into your letterbox at least two days before the work starts. We will make other arrangements for our critical water customers.

Not every property in the streets listed in the interruption table below will be affected.

Localised construction impacts can include noise, dust or traffic changes.

If you have any questions about the works listed below or if you have a service interruption not listed, please call us on 07 3412 3412.

Date of works What is the project? Where is it happening? What can I expect?
Monday 20 September 2021 Repair leak on water main tee
  • Bookvale Drive
  • Ameea Ct
  • Mowie Close
  • Glencoe Street
  • Farzana Place;
  • Lima Court  
  • Oakvale Street
Water isolation on Monday 20/09/21 between 8.00am to 4:00pm
Monday 13 and Tuesday 14 September 2021 Fire hydrant replacement program
  • Silvertop Street
  • Hoop Street
  • Anzac Avenue
  • Vinca Street
  • Norfolk Street

Night works and temporary water isolation from 8pm to 5am. General construction impacts.

13 August to October 2021 Eagleby Network Disinfection Clean

Eagleby

For up to three weeks, the water supply for Eagleby will be changed.

Residents may notice a change in the taste and sometimes odour of their water.

In very rare occasions, residents may notice a temporary discolouration which can be resolved by running a tap for 5 minutes. If this doesn’t work, please call 3412 3412 for assistance.

For more information, download the Frequenly asked questions fact sheet (PDF 230 KB).

Wednesday 15 September 2021 Fire hydrant installation Aquarius Drive, Kingston  Water isolation between 8.00am to 4.00pm
Thursday 16 September 2021  Water main connection Bannockburn Road, Bannockburn Water isolation from 8.00am to 4.00pm

Construction impacts

Localised construction impacts can include noise, dust or traffic changes.

If you have any questions about the works listed below, please call us on 07 3412 3412.

Date of works

What is the project?

Where is it happening?

What can I expect?

14 June to late January 2022

Reservoir maintenance and repair works

Springwood Reservoir, Springwood Road, Springwood

Community access to the reservoir roof will be closed during works

Temporary traffic changes

Localised construction impacts

Until May 2022

Wastewater (sewage) pump station and pipeline construction

Sungold Road, Chambers Flat Sue Salisbury on 07 2899 7505

Until September 2021

Wastewater pump station and pipeline construction

River Hills Road, Eagleby

Localised construction impacts

Temporary traffic changes

Until mid-September 2021 Trunk main valve replacement Loganholme, near the Pacific motorway M1

Remaining work near M1 between 7.00 am and 5.00pm weekday.

Localised construction impacts
Increased level of noise, dust and vibration.

Frequent truck movements to and from work sites.

Some vegetation removal.

Until May 2023

Wastewater pipeline relining and maintenance hole relining

Various streets in Beenleigh, Rochedale South, Cornubia, Loganholme and Eagleby

Project fact sheet (PDF 300 KB)

Localised construction impacts