Logan City Council is upgrading a section of the Woodlands Drive stormwater catchment at Rochedale South.

Works involve installing new drainage infrastructure along sections of:

  • Woodlands Drive
  • William Street
  • Childs Street
  • Wendy Court
  • Lillian Court
  • Lancelot Street.

Project benefits

Thsi project will provide better flood protection in the Woodlands Drive catchment area during wet weather.

What are we doing?

Works will involve:

  • installing new drainage infrastructure (pipelines, maintenance holes and culverts)
  • upgrading sections of wastewater pipelines
  • improving the drainage outlet structure at Woodlands Park
  • replacing sections of kerb and footpaths, where needed
  • removing and trimming vegetation around the work zone, as required
  • landscaping at Woodlands Park
  • replacing or relocating services, as required 
  • residential driveway reconstruction
  • road pavement restoration.

Upgrading the infrastructure is complex as some of the new pipes measure up to three meters in diameter. This, combined with live traffic, a busy residential area and overhead and underground services, equals a challenging task.

To reduce the duration of the works, we will have multiple site crews actively working on the project.

This will speed up the works and reduce the duration of disruption to the community.

What can I expect?

The expected construction impacts are explained in the project works notification (PDF 225 KB)

Project Updates

April 2022 Update 

  • The wet weather experience from November to 2021 to mid-February 2022, has delayed construction activities on site.
  • Project works are now expected to be completed by late-September 2022 (subject to weather and site conditions).
  • Our contractor commenced installing the 3-metre stormwater pipes and sewer infrastructure along Woodlands Drive. This new pipe will connect to the newly installed stormwater pipes at Lancelot Street.
  • Our contractor has completed the asphalt resurfacing works along Lancelot Street.
  • Our contractor has commenced pavement reinstatement along Woodlands Drive from Hartog Place to William Street.
  • Notification of extended works (PDF 568 KB).

Traffic impacts

There will be progressive traffic changes during the works. These include:

  • reduced speed limits
  • progressive road / lane closures
  • associated traffic detours around the work zones.

Traffic controllers will be available help motorists and pedestrians during construction working hours.

Electronic signage and traffic controllers will provide updated traffic detour information.

We will list traffic arrangements below as more information becomes available.

Contact us

For more information about the project:

  • call our Communications team on 07 3412 4483
  • email us at roadcomms@logan.qld.gov.au