School Road Realignment

Latest update - December 2025

The design phase of the project is progressing, while we wait to receive the Environmental Protection and Biodiversity Conservation (EPBC) approval from the Department of Climate Change, Energy, the Environment and Water (DCCEEW). EPBC approval can take several years to complete, and Council do not have any control over how long this takes.

Logan Water early works are continuing, while we also coordinate service relocations with Energex, Opticomm and Telstra.

Select demolition activities are in progress.

Updates will be published here as the project progresses.

Project overview

As part of Council's Major Roads Capital Works Program, we are upgrading School Road to connect with the Chambers Flat Road / Park Ridge Road intersection. This project aims to:

  • Build a new urban road with two lanes in each direction
  • Improve east–west connectivity for public transport and active travel
  • Enhance safety and traffic flow for motorists and pedestrians.

Project timings

Construction details and timings will be shared as soon as they are confirmed.

Project features

  • Realignment of School Road with the Park Ridge road/Chambers Flat Road intersection
  • Two new three-way signalised intersections
  • Pavement upgrades and improved drainage
  • Dedicated foot path and shared pathway
  • Integration with Logan Water infrastructure works.

Project benefits

  • Improved road safety and traffic flow
  • Better connectivity for public transport and active travel
  • A smoother, safer, more resilient road surface
  • Modern signal infrastructure and operations.

Project impacts

Initial service location work is expected to be low impact.

Location

School Road, Logan Reserve   View Map

Google Map